AESOAlberta Electric System Operator, or the entity resonsible for managing the Interconnected Electric System for the province of Alberta, Canada

B

BaseloadUnits that consistently run providing a reliable amount of power
BCFBillion cubic feet, a unit of volume describing often large quantities of liquid such as water or natural gas
Binding ConstraintConstraint that does not allow any incremental power to flow after hitting the limit
BOMBalance of Month contract which trades based on the remaining days in the month

C

CAISOCalifornia Independent System Operator, or an Independent System Operator (ISO) that serves the state of California
Capacity FactorAverage of some unit over a period of time divided by the max value for the same time period
Capacity MarketGenerally a 3-4 year forward market to procure additonal generation in order to have an adequate supply
CDDCooling Degree Days
Clean Spark SpreadApproximation of profits to gas generation after carbon costs are deducted
Coal to gas switchingThe movement away from coal generation towards gas as a result of gas generation buildout
CongestionThe result of a bottleneck that restricts flows
Cumulative Capacity FactorAverage of some unit over a period of time divided by the max value over a longer period of time (acronym – CCF)

D

Dark SpreadApproximation of profits from coal generation similar to the spark spread
DARTDay ahead minus real time LMPs
DC Transmission LineThe transmission line that connects the Pacific Northwest to Southern California
DSWDesert Southwest power region

E

EIAU.S. Energy Information Administration, or an agency of the U.S. Federal Statistical System that is responsible for collecting and analyzing energy information
ERCOTElectric Reliablity Council of Texas, or an Independent System Operator (ISO) that serves the state of Texas
Evening RampBlock of hours between HE 17 and HE 22

F

FCForecast
Fish SpillAmount of water that is being allocation to non-turbine flow tied to the regional fish requirements
Flex RampThe period of time between the midday hours (12-3) and the evening ramp hours (18-21)
Forebay ElevationThe elevation of the pool of water held behind a dam
Fuel OilNo.2 or No.6 oil that is used to fuel electric generation

G

Gas to Oil switchingMoving from gas generation to oil generation generally caused by pipeline constraints or thermal generation moving beyond the gas stack

H

HDDHeating Degree Days
HRA measure of generation efficiency measured in Btus; This can also be derived for gas generation by dividing power prices by gas prices
Hydro ElectricityGeneration produced from water moving through a dam’s turbine

I

IESOIndependent Electric System Operator, or an Independent System Operator (ISO) for the province of Ontario, Canada
IntertieTransmission interconnection between two balancing authorities
ISOIndependent System Operators, or an organization formed at the direction or recommendation of the Federal Energy Regulatory Commission (FERC) that is responsible for coordinating, controlling, and monitoring the operation of an electrical power system; ISOs typically perform the same functions as RTOs, but often cover a small geographic area and have a nuanced differences in responsibilities
ISO-NEAn alternative abreviation for NEISO, or New England Independent System Operators; NEISO is an Independent System Operator (ISO) that serves Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont

K

kcfsThousand cubic feet per second – unit used in hydro flow dialogue; This is the most common unit of measurement for flows into and out of a hydro project as a rate

L

LFLoad Factor, or the average load over a period of time divided by the peak load during the same time period
LMPLocation Marginal Price, or the cost to buy or sell electricity with diferent ISOs and RTOs
LNGLiquefied natural gas, a form of natural gas that has been cooled down to liquid form to allow for safer transportation
LOMLack of Market Spill, or a hydro spill that entities do when the market price is below (or close to) zero

M

MAFMillion Acre Feet, or a unit used to detail the total amount of snowpack that is up in the mountains; This is the most common unit of measurement for river flows or water in storage as a volume; When used for flows, most typically refers to the volume of water over the period from January to July
Marginal UnitDenotes that these units are setting prices for the market
MCCMarginal Congestion Component
MidCRegion tied to the Pacific Northwest, actively traded power hub
Midday PeriodBlock of hours between HE 10 and HE 16
MISOMidcontinent Independent System Operator or an Independent System Operator (ISO) that serves all or parts of the Midwest United States, Manitoba of Canada, and a southern United States region; The US states served includes but is not limited to all or parts of Minnesota, Wisconsin, Michigan, Iowa, Illinois, Indiana, Missouri, Arkansas, Mississippi, and Louisiana
MLCMarginal Loss Component
Morning PeriodBlock of hours between HE 7 and HE 9
MTDMonth To Date, an aggregate of data from the start of the current month until today

N

Needle PeakBlock of hours when the power demand is at its highest
NEISONew England Independent System Operators, or an Independent System Operator (ISO) that serves Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont
Net LoadTotal demand minus solar and wind generation
Net Thermal LoadTotal demand minus renewables (wind, solar and hydro), nuclear and any other non coal and natural gas power generation; The purpose of this netting is to get down to coal and natural gas powered generation
NGNatural Gas, a type of fossil fuel that is a major source of electric power generation in the United States
NP15North of Path 15
NYISONew York Independent System Operator, or an Independent System Operator (ISO) that serves the state of New York

O

On MarginDenotes that these units are setting prices for the market
ORDCOperating Reserve Demand Curve (ERCOT market)

P

Path 15Transmission path that connects Northern to Central California
Path 26Transmission path that connects Central to Southern California
PeakerLess efficient generation that is called on to solve peak demand
PJMPJM Interconnection LLC, or a Regional Transmission Organiztion (RTO) in the United States that serves all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia
PNWPacific Northwest power region
PPAPower Purchase Agreement, or a contract between a buyer and a seller that defines the terms for the sale of power

R

RatepayerResidential customers that end up paying for additional regulation
RECRenewable Energy Certificate, or a certificate that represents possesion of the non-power attributes of one megawatt hour’s worth energy that was generated from a renewable source
Regulated FlowsActual observed river flows, often measured at Grand Coulee, Lower Granite, or The Dalles dams
River BasinWe divide the PNW hydro system into different basins or collections of projects by region; See FAQ section question for more detailed table and map
RT/DA LMPReal Time / Day Ahead Locational Margin Prices (See LMP); Day Ahead prices settle the day before the operating day, allowing power to be bought and sold well in advance and with lower volatility; Real Time LMPs settle at many points during the operation day, allowing power to be bought and sold based on current supply and demand
RTORegional Transmission Organization, or an organization formed at the direction or recommendation of the Federal Energy Regulatory Commission (FERC) that is responsible for coordinating, controlling, and monitoring the operation of an electrical power system; RTOs typically perform the same functions as ISOs, but often cover a larger geographic area and have a nuanced differences in responsibilities

S

Shadow PricesPrices that are a result of some sort of grid balancing that gives a person insight to what will impact the overall price action
Shoulder SeasonSpring and Fall when demand on generation is generally low
SP15South of Path 26
Spark spreadApproximation of the money that would be collected by efficient gas generation; Assuming a heat rate for gas generation this is: LMP – gas price * HR
SpillTerm used in the hydro setting to describe how much water (in kcfs)
SPPSouthwest Power Pool, or a Regional Transmission Organiztion (RTO) in the United States that serves all of parts of Arkansas, Iowa, Kansas, Louisiana, Minnesota, Missouri, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas and Wyoming
Summer SeasonThe months between April and October, used in the natural gas world for power demand (AC) load
Super PeakBlock of hours between HE 15 and HE 18
Supply stackThe group of generation running composed of all units online

T

TransmissionElectrical wires that are able to move electricity from one point to another

U

Unregulated FlowsThis refers to river flows attributed only to precipitation and snow melt; Estimates of unregulated flows adjust for dam operations such as stored/released reservoir water and are intended to reflect what actual river flows would have been if dams were not present

W

Winter SeasonThe months between November and March, used in the natural gas world for residential demand

Z

ZP26Zone created to get between Path 15 and Path 26 in California’s Independent System Operation set-up